Starting from midnight on April 15, Shenzhen Railway will implement the second quarter train operation plan. It will increase the frequency of loop line trains and enhance capacity on the Meizhou-Shantou line. By adding 5 new pairs of “Golden Loop” trains connecting Guangzhou, Shenzhen, and cities in eastern Guangdong, it will significantly improve the efficient connection between the eastern Guangdong city cluster and the core cities of the Guangdong-Hong Kong-Macao Greater Bay Area, further promoting regional integration and the smooth operation of the “one-hour living circle”.
Shenzhen Railway Increases Loop Line Frequency
Facilitating Efficient Connectivity Between the Bay Area and Eastern Guangdong
According to the Shenzhen Railway department, this schedule adjustment adds 5 new pairs of loop line trains. These trains connect via multiple lines including the Guangzhou-Shenzhen-Hong Kong High-Speed Railway, Hangzhou-Shenzhen Line, Meizhou-Shantou Line, Meizhou-Longchuan High-Speed Railway, Beijing-Hong Kong High-Speed Railway, and Ningbo-Guangzhou High-Speed Railway, forming a “Golden Loop” that links Guangzhou, Shenzhen, and cities in eastern Guangdong.
Notably, the G5256/3 loop line train, which starts and ends at Shenzhen Station, passes through stations such as Huizhou South, Shanwei, Shantou, Meizhou West, Wuhua, and Heyuan East before returning to Shenzhen Station. Several other loop line trains, including Guangzhou South–Guangzhou C6775/8/5 and C6783/6/3, Guangzhou–Foshan West C6776/7/6, and Guangzhou–Guangzhou South C6784/5/4, all pass through Shenzhen North Station.
Furthermore, new loop line services have been added, including Guangzhou–Shenzhen G8480/1, Shenzhen–Guangzhou G8482/79 and G5254/5, Guangzhou East–Shenzhen G8432/1, and Shenzhen–Guangzhou East G8478/7.
The newly added trains, such as Shantou–Shenzhen G5250/1, Shantou–Dongguan South D7362/3/2 (via Shenzhen North), and Dongguan South–Shanwei D7365/8 (via Shenzhen North), further increase transportation capacity between the Chaoshan region and the Shenzhen Special Zone, providing passengers with more ticket options and a better travel experience.
Shenzhen ⇌ Nanning
2.5-Hour Direct High-Speed Rail Link
Recently, the Xinzhong Tunnel of the SNSG-2 bid section of the Shenzhen-Nanning High-Speed Railway, which connects Guangdong and Guangxi provinces, was successfully completed, marking a breakthrough in the project’s construction. This tunnel, with a total length of 3.22 kilometers, is currently the longest tunnel completed on the Shenzhen-Nanning High-Speed Railway.
The Shenzhen-Nanning High-Speed Railway is located within Guangdong Province and the Guangxi Zhuang Autonomous Region. It starts from Shenzhen City in Guangdong Province in the east and extends to Nanning City, the capital of Guangxi, in the west, with a total length of approximately 661 kilometers. It is a new high-speed rail corridor for the Guangdong-Hong Kong-Macao Greater Bay Area to rapidly access the southwestern region.
The Guangdong section of the Shenzhen-Nanning High-Speed Railway is approximately 357 kilometers long, consisting of:
Shenzhen-Jiangmen Railway (116 km): The section from Shenzhen Xili to Nansha has a design speed of 200 km/h, and the section from Nansha to Jiangmen has a design speed of 250 km/h. It includes 7 stations: Xili, Shenzhen Airport East, Dongguan Binhaiwan, Nansha, Zhongshan North, Henglan, and Jiangmen.
Zhuhai-Zhaoqing Railway, Jiangmen to Pearl River Delta Hub Airport section (99 km): Design speed of 350 km/h, with 4 stations: Jiangmen, Heshan West, Gaoming, and Pearl River Delta Airport.
Pearl River Delta Hub Airport to Provincial Boundary section (142 km): Design speed of 350 km/h, with 2 stations: Yunfu and Luoding North.
According to the plan, the Shenzhen-Nanning High-Speed Railway is expected to be completed and open to traffic in 2027. Upon completion, the fastest travel time from Shenzhen to Nanning will be only 2