Given that the current round of heavy rainfall has ended and the river water levels across the province have stabilized, in accordance with the “Guangdong Province Flood, Drought, Wind, and Freezing Emergency Response Plan” and relevant regulations of the Provincial Flood Control Headquarters, the decision was made to terminate the Level IV flood emergency response at 15:00 on August 8.
Due to the persistent heavy rainfall, the current river water levels in Guangdong remain high, and the soil moisture content is saturated. All regions and departments must remain vigilant and continue to strengthen efforts in geological disaster prevention and inspection during the water recession phase. It is essential to manage the relocation and安置 of affected individuals, strictly prohibiting unauthorized returns before risks are fully resolved, adhering to the principle of “no safety, no return.” Efforts should be accelerated to repair damaged infrastructure and restore normal production and living conditions as soon as possible, ensuring the safety and security of people’s lives and property.